Photographs taken between 9th & 13th April 2008 / 24-1128
Taken by David Coleman
Uploaded on 14/04/2008

Previous

Home

24-1128

Inside the shed, the shuttering for the last section of west pit wall is mostly in place (but needs a top section adding and lining, levelling and bracing).