Photographs taken between 9th & 13th April 2008 / 24-1128 Taken by David Coleman Uploaded on 14/04/2008
Inside the shed, the shuttering for the last section of west pit wall is
mostly in place (but needs a top section adding and lining, levelling
and bracing).