Rheilffordd Corris Railway

Rheilffordd Corris Railway

In the Heart of the Land of the Little Trains

×

  • Home
    • Welcome!
    • Timetable & Special Events
    • Join the Corris Railway Society
    • Renew Existing Membership
    • Other Links
    • Contact Us
  • About Us
    • Introduction
    • Renaissance – 1966 on
    • The Present
    • The Future
      • The Falcon Locomotive
        • Falcon Build Images
      • The Southern Extension
        • Goedwig South
      • Corris Station
    • Volunteering
  • Shop
    • Badges
    • Books & Journals
    • Christmas Cards
    • Drawings & Plans
    • DVD’s
    • Miscellaneous
    • Model Kits
    • Postcards etc.
    • Posters
    • Specials
    • T-Towels
  • More Information
    • Accommodation
    • Maespoeth Engine Shed
    • New Build Carriages
    • Photograph Archives
      • 2020 Photographs
      • 2019 Photographs
      • 2018 Photographs
      • 2017 Photographs
      • 2016 Photographs
      • 2015 Photographs
      • 2014 Photographs
    • Statutory Information
    • The Railway Museum
    • The Tattoo Locomotive
  • News
    • Photographs
    • Videos
    • Press Releases
  • How To Find Us

2016 Photograph Archive

Photographs taken between 14th & 18th October 2016

Tuesday, 18.10.2016. Bob continues machining the link for carriage No. 20’s brakes ...
… before going under the carriage to fit it, while Dick puts the brakes on – or off – as required.
Meanwhile, Adrian finishes off the buffer bands, here countersinking the holes for the securing screws …

… before drilling pilot holes for the screws …
… with Phil following behind, painting them.
Neil is sanding down the moulding created to conceal wiring for carriage No. 20 …

… while Charles entertains a group of enthusiasts from the Llangollen area.
There is then a grand shunt of stock …
… while No. 6 is providing air to further test No. 20’s brakes, and the “Queen Mary” waggon can …

… come out …
… so that it can be tested with a “live” load …
… on a successful gravity run!

Two other waggons are added and successfully run down from Corris, at an average speed of 8mph.
Back in the Carriage Shed, the floor is cleared for the AGM next weekend …
… amid much amusement!

The moulding is treated …
… and the last of the bogie spring support brackets for carriages 23 & 24 have been cleaned up and treated with primer.
While up the line, it was observed that lineside trees have acquired tags from a new inspection programme.

Friday, 14.10.2016. The cable for the hydro-electric scheme is being fed along the connecting trench …
Saturday, 15.10.2016. … towards our future trackbed (in the background) …
Tuesday, 18.10.2016. … and excavation has started across the Trunk Road.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Shopping Cart

What’s New

  • Side Sheet Adaptations To Feature In Cab Construction For New Steam Locomotive As Corris Railway Seeks Traverser Funding
  • For The First Time Since 1930 Corris Railway Number 4 Will Take Passengers For A Journey From Corris Station
  • Photographs taken on 19th & 25th December 2020
  • Photographs taken between 12th & 18th December 2020

Latest Photographs

A view of the North platform in the evening light, Christmas now less than a handful of days away, with a new Welsh lockdown due at Midnight tonight this would be the last working day on the railway for a while. The rail bolster wagon sat in the South Platform road, with a bit of work this will be a good addition to the fleet. The first few wagons have reached the North platform, to be propelled back into the South platform to enable space to extract the other few rakes. The fairly poor condition of the CAT carriage here is very noticeable – the chassis seems to look OK. Saturday,  19.12.2020. Time for a grand shunt of the head-shunt at Maespoeth. With the ultimate aim of extracting the “CAT Carriage” for restoration to begin in 2021. Friday 25th December… NadoligLlawen-Happy Christmas, at Corris Station. Chris couples up the CAT wagon (which we had left outside the new wagon shelter mid shunt) in order to propel it towards the new shelter in the hope it would fit. “Doh!” – not quite. With the light failing, loco 6 sits at the head of the ‘serviceable’ works wagons ready to return them to their resting place in the siding. To enable the carriage to thoroughly dry out prior to sorting its contents and begin stripping work, it was dragged into the loco shed behind No.6 and fitted in with a couple of inches to spare. The wagon which until recently was used to store loco 10’s new boiler is next to be dragged out the undergrowth, along with four ex RNAD Trecwn wagons. The view up the siding from the cab of loco 6, the railhead by this point had become extremely greasy and sand needed to be found to gain adhesion.

Latest Products

  • Slate Coaster (matchbox logo) Slate Coaster - Logo design £1.25
  • The Corris Railway by Peter Johnson The Corris Railway: The Story of a Mid-Wales Slate Railway by Peter Johnson £30.00 £25.00
  • Kerr, Stuart & Co Ltd locomotive catalogue Kerr Stuart Locomotive Catalogue Reprint, 2009 £6.95
  • Gala Day Line Up Postcard - Gala Day Line Up £0.50
Falcon Locomotive Appeal LeafletGroup Booking Form
Gift AidStanding Order Form

Rheilffordd Corris Railway

Station Yard Corris, Machynlleth, Powys, SY20 9SH

01654 761701 - Corris Museum & Station
01654 761303 - Maespoeth Engine Shed
General Email - enquiries@corris.co.uk

Rheilffordd Corris Railway Heritage Lottery Funded Transport Trust Heritage Railway Association

Useful Links

  • Corris Discuss Forum
  • Committee Members
  • Data Protection Policy
  • Operational Information
  • Safety Management System

Let’s Get Social

Copyright © 2018-2021 Corris Railway Society All Rights Reserved. Solution by totalwebsystems
  • Facebook
  • Twitter
  • Instagram
  • YouTube
  • TripAdvisor